Speedy Demonstration on Northampton A-Road

16th Sep 2009

Safetrack Crack Infill, Stirling Lloyd’s ‘fretted’ joint and crack repair product, has recently impressed in Northamptonshire following a speedy demonstration on a busy A road.

30lm of Safetrack Crack Infill was applied to the A4500, Wellingborough Road, which had been suffering from ‘fretted’ joints in the middle of the carriageway, in a demonstration to MGWSP (the joint venture between May Gurney and WSP Group) Northamptonshire Highways.

The speed of application and cure was highly impressive; unlike the method usually used, which requires the cutting out of the defective joint and reinstating the surface, which would typically take half a day. In contrast this application of Safetrack Crack Infill, including the traffic management, preparation of the surface, application of the product and return to service, took just one hour - representing large savings in both cost and time.

The outcome: the live demonstration impressed so much so that MGWSP Northamptonshire Highways are set to use Safetrack Crack Infill on other roads in the county in the near future.

For more information please Contact Us.